Skip to main content

How do I set up manufacturing for a company?

Fill Manufacture and Controlling Setting with the issuance, receipt and resource journals, make the manufacturing units with their warehouse lines, and the operations and routings.

Who
The consultant with the accountant
Takes effect
On save
Needs first
Journals, sites, warehouses, resources

Before you start​

Steps​

  1. On Manufacture and Controlling Setting, fill Journal For Issuance, Journal For Receive and Journal for Resource, or per site on the lines.
  2. Decide the switches: yield calculation, BOM-less orders, hiding BOM or routing, variant checks, transfer requests.
  3. On Manufacturing Unit, make each unit with its site and at least one line with an input and an output warehouse (leave category and type empty for a general line).
  4. Make the Operation records and a Routing per made item with resources and hours.
  5. On each made item, set the Manufacturing Unit.

Check it worked​

  • A manufacturing order for a made item gets its warehouses from the unit and can be released; its confirmation posts without asking for journals.

If something looks wrong​

  • "There is an problem in Production Unit Input/Output Warehouse" The unit has no matching line.
  • "Please Define Issuance Journal in Setting" Fill the issuance journal.