Routing

A routing: for one item, the operations in sequence, and on each the resources with their hours and cost per hour.

Where
Product Information › Routing and Manufacturing › Routing
Who uses it
The production engineer
When
Before the item is made
Needs first
Operation, resources and resource groups (company setup), the item released with Type BOM or FOR

What it is for​

A Bill Of Material or Formula names its routing, and the Manufacturing Order copies the routing's operations and resources. On the confirmation the actual hours of each resource are entered and their cost is posted.

On each operation line, the Resource link opens the resources. For each resource: the hours of setup, run, wait and move, and Standard Cost Per Hour; Total Cost is the hours times the cost. The operation line shows Total Hours and Total Cost, and the header sums them.

Rules: Valid To may not be before Valid From, the routing needs at least one operation line, every operation line needs a resource, Sequence must be above zero and hours may not be zero or negative. Clone is allowed.

Every field in plain words​

FieldWhat it meansWhat to put
RoutingThe short code.Cannot be changed once saved. Required
Item NoThe item made.An item of Type BOM or FOR. Required
Item VariantThe variant, if any.Optional
NameIts name.Filled in. Required
QuantityThe quantity the routing is for.Above zero
Total HoursSum of the lines.Calculated
Total CostSum of the lines.Calculated
AlternateAn alternate routing.As needed
Standard CostStandard cost.Calculated
ApprovedApproved.Tick
Approved ByWho approved.Pick a person
SiteThe site.Pick one. Required
ProjectA project.Optional
Valid FromValid from.A date
Valid ToValid until.A date
BlockMarks the record as blocked.Tick to retire it

Operations​

One line per operation.

FieldWhat it meansWhat to put
OperationThe operation.Pick one
NameIts name.Filled in
SequenceThe order.Above zero
Sequence RuleHow it follows the previous one.Pick one
Total HoursHours of its resources.Calculated
Total CostCost of its resources.Calculated
ResourceLink. Opens the resources of this operation.
Line TextA note on the line.Any text

The resources of one operation.

FieldWhat it meansWhat to put
Resource GroupThe resource group.Pick one
NameIts name.Filled in
ResourceThe resource: a machine or a crew.Pick one
NameIts name.Filled in
FixedHours do not grow with quantity.Tick for fixed time
SequenceOrder within the operation.Above zero
Set Up Time In HourSetup hours.Hours
Run Time In HourRun hours.Hours
Wait Time In HourWait hours.Hours
Move Time In HourMove hours.Hours
Standard Cost Per HourCost per hour.An amount
Total CostHours times cost.Calculated
Line TextA note on the line.Any text

How to configure it​

There is nothing to configure beyond the fields above. Which fields are shown, required or hidden can be changed per company by the consultant in the screen configuration.

Scenarios​

  • A furniture maker cuts, assembles and polishes, each on its own machine and crew. Three operations; on each, the machine and the crew with their hours and hourly cost.

What it is connected to​

If something looks wrong​

  • "Production Routing - Valid To cannot be smaller than Valid From" Fix the dates.
  • "Operations Lines cannot be empty" Add an operation.
  • "Basic Data - Line ID: ... - Resource cannot be empty" Open the Resource link and add a resource.
  • "Production Order - Quantity cannot be zero or less then zero" Enter a quantity.
  • "Sequence cannot be zero or negative" / "Hour cannot be zero" / "Hour cannot be negative" Fix the sequence or the hours.