Skip to main content

Lists, reports and boards

Every list, report and board tile of Product Information, Master Planning and Manufacturing, with where it sits and the criteria it asks for. A criteria marked "required" must be filled before the list runs.

Lists, reports and boards all work the same way: see the start-here pages of this site.

Lists​

ListMenuCriteria
Item In GeneralProduct Information › ItemInventory Unit
Item In Legal EntityProduct Information › ItemItem No, Item Posting, Item Valuation, Storage Structures, Tracking Structure, Item Structure, Item Group, Sales Organization, Sales Group, Distribution Channel, Legacy Item Number, Brand
Item GroupProduct Information › Itemnone
Item Sub GroupProduct Information › Itemnone
Pricing ProfileProduct Information › Item PricingPricing Period, Price Model, Active Only
Bill Of MaterialProduct Information › Bill Of Material, Manufacturing › Bom / FormulaBOM, Active Only
BOM/Formula DetailManufacturing › Bom / FormulaBom/Formula (required)
BOM/Formula Detail AlliedManufacturing › ManufactureBom/Formula (required)
RoutingManufacturing › RoutingRouting
PlanManufacturing › ManufacturePlan, Plan Date
Plan LinesManufacturing › ManufacturePlan, Plan Date
Manufacturing Plan against Sales Order - AlliedManufacturing › ManufacturePlan, Plan Date, Sales Order, Item No
Manufacture OrderManufacturing › OrdersManufacturing Order, Type, Item No, BOM, Manufacturing Date
Manufacture Order LinesManufacturing › OrdersManufacturing Order, Type, Item No, BOM, Manufacturing Date
Manufacturing StatusManufacturing › OrdersItem No, DateFrom (required), DateTo (required)
Manufacture Order ConfirmationManufacturing › ManufactureManufacturing Order, Production Order Status, Manufacturing Category, Confirmation Date, Type, Manufacturing Unit, Manufacturing Pool, Item No, Item Category
Manufacture Order Confirmation Lines With CostManufacturing › ManufactureConfirmation, Type, Confirmation Date, Production Order Status, Manufacturing Category, Manufacturing Unit, Manufacturing Pool, Item No
Manufacture Order Confirmation LinesManufacturing › ManufactureConfirmation, Type, Confirmation Date, Manufacturing Unit
Manufacture Confirmation SummaryManufacturing › ManufactureDate From (required), Date To (required)
BOM vs Actual ConsumptionManufacturing › ManufactureConfirmation Date (required), Item, Type
Plan (master planning)Master Planning › Master Planningnone

Printed reports​

ReportMenuCriteria
Bom/Formula (Form)Product Information › Bill Of Material, Manufacturing › Bom / FormulaFormula
RoutingManufacturing › RoutingRouting
PlanManufacturing › ManufacturePlan, Plan Date, Manufacturing Unit
Manufacture Order (Form)Manufacturing › OrdersManufacturing Order, Type, Item No, BOM, Manufacturing Date
Daily Manufacturing StatusManufacturing › ManufactureManufacturing Date (required), Site (required)
Manufacture Order Confirmation (Form)Manufacturing › ManufactureConfirmation
Manufacture TraceabilityManufacturing › ManufactureConfirmation, Manufacturing Order, Manufacturing Item, Manufacturing Batch Number, Consume Item, Consume Batch Number

Manufacture Traceability can be run by the manufactured item and batch, or by a consumed item and batch, which is where a recall starts.

The module also carries a Maintenance Confirmation (Form) report; it belongs to maintenance, see Service and maintenance.

The Production board​

The board Production holds nine tiles:

TileShows as
Manufacturing orders opena figure
Ordered against produced by itemprogress bars
Output against material issued by montha column chart
Scrap ratea figure
Material used against BOMa table
Work in progressa figure
Order statusa band
Late manufacturing ordersa table
Plan against manufacturing ordersprogress bars