Plan Order

A plan order: the plans up to a Till Date, each accepted or voided, totalled per item in the purchase unit. Purchase requisitions are copied from it.

Where
Master Planning › Master Planning
Who uses it
The buyer
When
Each buying cycle
Needs first
Plan records

What it is for​

On Create, the Original part fills with every plan up to the Till Date not yet on a plan order, all accepted. Accept All and Reject All on the toolbar tick or untick them together; each line must be Accepted or Void. The Compute part totals the accepted lines per item, variant, site, warehouse and plan type, at the earliest required date, converted to the item's purchase unit and rounded up to a whole unit.

A purchase requisition (Purchase Requisition) is then copied from the plan order's compute lines.

Note: the screen means to refuse deleting a plan order with requisitions, but the check never stops the delete today.

Every field in plain words​

FieldWhat it meansWhat to put
TransactionThe plan order number.Given on Create. Required
Till DatePlans up to this date are gathered.A date

Original​

The plans gathered.

FieldWhat it meansWhat to put
PlanThe plan.Each once
Item NoThe item.Pick an item. Filled in by the system
NameIts name.Filled in
Item VariantIts variant.For a variant item. Filled in by the system
Required DateRequired date.Filled in by the system
Required TimeTime.Filled in by the system
AcceptedTake it.Tick Accepted or Void
VoidLeave it out.
Original UnitUnit.Filled in by the system
Original QuantityQuantity.Filled in by the system
CW Original UnitCatch weight original unit.Filled in by the system
CW Original QuantityCatch weight original quantity.Filled in by the system
CW UnitCatch weight unit.Filled in by the system
CW QuantityCatch weight quantity.Filled in by the system
Line TextA note on the line.Any text

Compute​

The totals per item.

FieldWhat it meansWhat to put
Item NoItem.Filled in by the system
NameName.Filled in by the system
Item VariantVariant.Filled in by the system
Required DateEarliest required date.Editable
Required TimeTime.Editable
UnitPurchase unit.
QuantityTotal, rounded up.Editable
CW Original UnitCatch weight original unit.Filled in by the system
CW Original QuantityCatch weight original quantity.Filled in by the system
CW UnitCatch weight unit.Filled in by the system
CW QuantityCatch weight quantity.Filled in by the system
Line TextA note on the line.Any text

How to configure it​

There is nothing to configure beyond the fields above. Which fields are shown, required or hidden can be changed per company by the consultant in the screen configuration.

Scenarios​

  • A store buys monthly from many small needs. At month end, a plan order up to the last day, then a purchase requisition from it.

What it is connected to​

If something looks wrong​

  • "Please Tick Either Accepted or Void" Tick one on each original line.
  • "Quantity cannot be zero" / "Inventory Quantity cannot be zero" Fix the quantities, or the item's purchase unit factor.
  • A plan appears twice. Each plan may appear once.