Material Requirement Planning

One run of material requirement planning for one master plan: what every level of the bills of material needs, what is in stock or on order, and what must be ordered. Saving it can raise purchase requisitions and manufacturing orders.

Where
Master Planning › Master Planning
Who uses it
The production planner or the buyer
When
After a master plan is made
Needs first
Master Planning, approved and valid bills of material, warehouses marked Required in MRP (inventory)

What it is for​

Pick a Plan that has no run yet and a Transaction Date, choose the view (detail or summary), tick what the run should do, then press Create. The run works out the requirement and fills the lines; Plan, Transaction Date and the three ticks are then fixed.

How the requirement is worked out.

  1. Each plan line is exploded through the bill of material valid on the Transaction Date, level by level. A component that is itself made needs its own valid BOM, or the run stops.
  2. With Validate Available Stock, each component is netted: free stock in the warehouses of the plan's site marked Required in MRP, plus quantity still open on purchase orders, is taken off the requirement. When a made component is fully covered, its own components drop out. Items allowed to go negative are not netted.
  3. The summary per component gets an Order Date (the plan required date minus the item's Safety Lead Time) and an Ordered Quantity, raised to the item's Minimum Order Quantity and rounded up to its Order Multiple.

On Save, for a new run:

  • Create Purchase Requisition: one requisition per order date, required date, purchase organization and purchase group, with the bought components' ordered quantities, saved as draft with the Purchase Reason and responsibles you give.
  • Create Manufacturing Order: one Planned manufacturing order per made component, BOM and variant, dated on the Transaction Date, with the item's manufacturing unit, pool and category, the BOM's routing (or the item's first valid routing) and batch yield.

Either tick needs Validate Available Stock.

Every field in plain words​

FieldWhat it meansWhat to put
TransactionThe run number.Given on Create. Required
Transaction DateThe date bills of material must be valid on.A date; fixed after Create. Required
PlanThe master plan.A plan without a run. Required
View OnDetail or summary view.DT or SM
Validate Available StockNet against stock and open purchase orders.Tick for a real run
Create Purchase RequisitionRaise requisitions on Save.Needs Validate Available Stock
Create Manufacturing OrderRaise manufacturing orders on Save.Needs Validate Available Stock
Purchase ReasonReason on the requisitions.Pick one
Responsibility CentralResponsibility centre on the requisitions.Pick one
ResponsibleResponsible on the requisitions.Pick one

Plan​

The plan lines.

FieldWhat it meansWhat to put
Item NoItem.Filled in by the system
Item VariantVariant.Filled in by the system
NameName.Filled in by the system
UnitUnit.Filled in by the system
Plan Required DateRequired date.Filled in by the system
Plan QuantityQuantity.Filled in by the system
Line TextA note on the line.Any text. Filled in by the system

Requirement detail​

Every level of the explosion (detail view).

FieldWhat it meansWhat to put
Plan Required DateThe date the plan needs it.Filled in by the system
ProductThe parent item.Filled in by the system
SequenceIts place in the tree.Filled in by the system
ComponentThe component.Filled in by the system
NameIts name.Filled in
BOMThe BOM used.Filled in by the system
ReplenishmentBought or made.Filled in by the system
Required QuantityRequired.Filled in by the system
UnitThe unit.Pick a unit. Filled in by the system
Line TextA note on the line.Any text. Filled in by the system

Summary​

One line per component and date.

FieldWhat it meansWhat to put
Plan Required DateThe date the plan needs it.Filled in by the system
ComponentThe component.Filled in by the system
NameIts name.Filled in
BOMThe bill of material used.Filled in by the system
ReplenishmentBought or made.Filled in by the system
Required QuantityQuantity required.Filled in by the system
UnitThe unit.Pick a unit. Filled in by the system
Physical AvailableFree stock.Filled in by the system
Open PO QuantityOpen on purchase orders.Filled in by the system
Ordered QuantityTo order.Filled in by the system
Required DateRequired date.Filled in by the system
Line TextA note on the line.Any text. Filled in by the system

Order Detail​

What is to be ordered.

FieldWhat it meansWhat to put
Order DateOrder date.Filled in by the system
Item NoThe item.Pick an item. Filled in by the system
Item VariantIts variant.For a variant item. Filled in by the system
NameIts name.Filled in
ReplenishmentBought or made.Filled in by the system
UnitThe unit.Pick a unit. Filled in by the system
Order QuantityQuantity.Filled in by the system
SiteSite.Filled in by the system
WarehouseWarehouse.Filled in by the system

How to configure it​

Mark the warehouses the run may count with Required in MRP on the warehouse (inventory). The item's Safety Lead Time, Minimum Order Quantity and Order Multiple shape the result; its Maximum Order Quantity is not applied.

Scenarios​

  • A furniture maker plans 200 tables and needs to know how much timber to buy. Run on the plan with Validate Available Stock and Create Purchase Requisition.
  • Sub-assemblies are made in-house. Tick Create Manufacturing Order too; the made sub-assemblies get Planned orders.

What it is connected to​

If something looks wrong​

  • "If you want to create Purchase Requisition you have to run with Validate Available Stock" Tick Validate Available Stock.
  • "There is no Production Plan found" The plan has no lines.
  • "There is no BOM found in Transaction Date ..." No BOM of the plan items is valid on that date.
  • "There is no BOM of ... found in Transaction Date ..." A made component has no valid BOM.
  • "Warehouses are not marked as Required in MRP" Mark the warehouses on the site as Required in MRP.
  • My plan is not offered. It already has a run.