Skip to main content

Usage

A usage: what a bill of material or formula is for, and whether it is a BOM or a formula.

Where
Product Information › Bill Of Material and Manufacturing › Bom / Formula
Who uses it
The production engineer
When
At setup
Needs first
Nothing

What it is for​

Every Bill Of Material and Formula names a usage; Type BOM usages are offered on bills of material, FOR usages on formulas. The ticks decide where a BOM may be used:

  • Production: the BOM is for items of any manufacturing category except Assembly Order.
  • Assembly: for items of category Assembly Order. Only a BOM type usage may be Assembly.
  • Costing, Template and Subcontracting: such BOMs are not offered on a manufacturing order. A Template usage also skips the alternate-BOM check, and on a formula with a Subcontracting usage a Default Vendor is required.
  • Kit: recorded; nothing reads it today.

Every field in plain words​

FieldWhat it meansWhat to put
UsageThe short code.Cannot be changed once saved. Required
NameThe name shown in lookups and on documents.A clear name. Required
TypeBOM or FOR.Pick one. Required
ProductionFor normal production.Tick
CostingFor costing only.Tick for costing BOMs
AssemblyFor assembly orders.BOM type only
TemplateA template BOM.Tick for templates
SubcontractingMade by a subcontractor.Tick for subcontracting
KitRecorded only.Leave as is

How to configure it​

There is nothing to configure beyond the fields above. Which fields are shown, required or hidden can be changed per company by the consultant in the screen configuration.

Scenarios​

  • A factory keeps a costing BOM apart from the one used on the floor. Two usages, one with Costing ticked; the costing BOM is never offered on an order.
  • A garment maker sends cutting to a subcontractor. A Subcontracting usage; the formula needs the default vendor.

What it is connected to​

If something looks wrong​

  • "Assembly can select in BOM Type" Assembly needs Type BOM.
  • My BOM is not offered on the manufacturing order. Its usage is Costing, Template or Subcontracting, or the BOM is not approved or not valid on the order date.