Manufacture and Controlling Setting

One document per company: the journals manufacturing posts through and the switches that shape the manufacturing screens.

Where
Manufacturing › Setting
Who uses it
The implementation consultant with the accountant
When
At setup, before the first manufacturing order
Needs first
Transaction journals of the right kinds (issuance, receipt, voucher, transfer) in the general ledger

What it is for​

Manufacturing reads this document for the company you are logged in to. What each part does:

Production Confirmation Journal. Journal For Issuance is used for the automatic issue of components on a confirmation, Journal For Receive for the automatic receipt of the finished good, Journal for Resource for the voucher of resource cost. The lines below give an issuance and receive journal per site; they are used only when the company-wide journal above is empty. With no issuance journal the confirmation is refused; with no receive journal the finished good is simply not received automatically; with no resource journal and resource cost to post, the confirmation is refused.

Default Parameters.

  • Flushing Indicator: when set, every consumption line of a confirmation takes this indicator.
  • Required Packing Unit: when off, the Packaging part of the manufacturing order is not used.
  • Auto Create Transfer Request Automatically with Auto Transfer Request Journal: when you tick it and save, every site of the company is switched to create transfer requests for manufacturing; a released manufacturing order then raises a transfer request moving its components from their default warehouses to the order's input warehouse.
  • Required Opportunity: recorded; nothing reads it today.

Controlling.

  • Required Auto Yield Calculation on Confirmation: the confirmation splits the confirmed quantity into good and rejected by the order's batch yield.
  • Manufacturing order can processed without bom/formula: a Standard order may be saved without a Bom/Formula.
  • Hide BOM In Production Order / Hide Routing In Production Order: hide those parts on Standard orders and on confirmations.

Validation.

  • Require Item Variant: a bill of material line of a variant item must name the variant. With no setting document this check is on.
  • Require Item Variant in Manufacturing Order: the same on the order's lines; when off, the variant column is locked.
  • Hide Date From & Date To in Master Planning (PCPP): the copy from sales orders offers only approved orders and ignores the promise date range.
  • Required Multiple, Required Quatity and Required Multiple Base On: on Master Planning, a plan must hold several lines; see that page.

Every field in plain words​

FieldWhat it meansWhat to put
Auto Create Transfer Request AutomaticallyRaise transfer requests from released orders.Tick to use it
Auto Transfer Request JournalThe journal of those transfer requests.Required when the tick is on
Required Auto Yield Calculation on ConfirmationSplit confirmed quantity by batch yield.As needed
Required MultipleA plan must hold several lines.As needed
Required Multiple Base OnCount items (ITM) or item groups (ITG).Pick one
Required QuatityHow many lines or item groups a plan needs.A number; then Base On is required
Hide Date From & Date To in Master Planning (PCPP)See What it is for.As needed
Hide BOM In Production OrderHide the BOM part.As needed
Hide Routing In Production OrderHide the Routing part.As needed
Manufacturing order can processed without bom/formulaStandard orders may have no Bom/Formula.As needed
Flushing IndicatorOverrides the flushing indicator of every consumption line.Usually empty
Required Packing UnitUse the Packaging part of the order.Tick to use it
Require Item VariantVariant required on BOM lines.On unless you want otherwise
Require Item Variant in Manufacturing OrderVariant required on order lines.On unless you want otherwise
Journal For IssuanceJournal for the automatic issue of components.An issuance journal
Journal for ResourceVoucher journal for resource cost.A JV journal
Journal For ReceiveJournal for the automatic receipt of the finished good.A receipt journal
Required OpportunityRecorded only; nothing reads it today.Leave as is

Journals by site​

Used only when the company-wide journal is empty.

FieldWhat it meansWhat to put
SiteA site.Pick one
Manufacturing UnitA manufacturing unit of the site.Optional
Journal For IssuanceIssuance journal for the site.Pick one
Journal For ReceiveReceive journal for the site.Pick one

Field Value​

Per-company field rules for the manufacturing screens: default value, required, greyed or hidden. A user's own default replaces the company line for that user.

FieldWhat it meansWhat to put
Process CodeThe screen.Pick one
Object NoThe field.Pick one
ValueIts starting value.Optional
MandatoryRequired.Tick
DisableGreyed.Tick
HiddenHidden.Tick

Special validations​

Recorded only; no manufacturing screen reads these lines today.

FieldWhat it meansWhat to put
Process CodeThe screen.Recorded only
Special ValidationA special validation.Recorded only

How to configure it​

This screen is the configuration. One document per company.

Scenarios​

  • A factory issues components automatically when output is confirmed. Set Journal For Issuance and Journal For Receive, and leave the BOM lines on flushing B.
  • Two plants post to different journals. Leave the company-wide journals empty and add one line per site.

What it is connected to​

If something looks wrong​

  • "Transfer Request Jounal is Mandatory" Auto Create Transfer Request is ticked. Pick the journal.
  • "... already exists" on Save. The company already has a setting document.