The confirmation of output on a manufacturing order: what came out, what was consumed, and the hours of each resource. Save issues the components, receives the output and posts the resource cost.

Where
Manufacturing › Manufacture
Who uses it
The production supervisor
When
When output is ready, once or several times per order
Needs first
A released Manufacturing Order; journals on Manufacture and Controlling Setting; resources with debit and credit accounts

What it is for​

Pick the order and enter Confirmation Quantity; the output, consumption and resource lines come from the order. With yield calculation on, the quantity is split into good and rejected by the batch yield.

What Save does, in one go:

  1. Issues every consumption line with flushing B and an actual quantity, through Journal For Issuance (an inventory issue document the system generates).
  2. Posts a voucher through Journal for Resource: for each resource, its actual setup, run, wait and move cost, debit the resource's debit account, credit its credit account.
  3. When the order is fully confirmed, completes its reservations.
  4. Receives the Good and Reject output lines into their warehouses through Journal For Receive (a production receipt the system generates), with the batch data. With no receive journal, nothing is received.
  5. Adds the quantity to the order, which becomes Closed when fully confirmed.

Reverse on the toolbar undoes the issue, the resource voucher and the automatic receipt and takes the quantity off the order. It is refused while a receipt you made by hand against this confirmation exists.

Every field in plain words​

FieldWhat it meansWhat to put
ConfirmationThe confirmation number.Given on Create. Required
Posting DatePosting date.Same as the confirmation date
Manufacturing CategoryFrom the order.Filled in
NotesNotes; also the text of the postings.Any text
Manufacturing OrderThe order being confirmed.A released order. Required
Confirmation QuantityHow much is confirmed now.Up to what is left
Confirmation DateThe date; it is also the posting date.Not before the order date. Required
Confirmation DateConfirmation date.
Confirmation TimeTime.
ResponsibleWho confirms.Pick a person

Confirm​

What came out: the item, and co-products or by-products.

FieldWhat it meansWhat to put
Item NoItem.From the order
Item VariantVariant.
NameName.Filled in by the system
TypeType of output.Filled in by the system
UnitUnit.
QuantityQuantity.The output lines must add up to Confirmation Quantity
Quantity StatusGood, Reject or another status. Good and Reject lines are received into stock.Pick one. Required
SiteSite.Required. Required
WarehouseWarehouse it goes into.Required. Required
Batch/Serial NumberBatch of the output.When the item is batch-tracked
Batch DateBatch date.When required
Batch Expiry DateExpiry.When required
Best Before DateBest before.When required
Line TextA note on the line.Any text

Consume​

The components used.

FieldWhat it meansWhat to put
Item CategoryCategory.Filled in by the system
Item NoComponent.From the order
Item VariantVariant.
NameIts name.Filled in
UnitUnit.Filled in by the system
Actual QuantityWhat was actually used.A quantity
Plan / Actual VariancePlan minus actual.Calculated
Variance ReasonWhy it differs.Any text
SiteThe site.Pick a site. Required
WarehouseWarehouse it is taken from.Required. Required
Batch/Serial NumberThe batch used.Pick an available batch
Flushing IndicatorB: issued automatically on Save; M: issue it yourself.From the BOM or the setting
Line TextA note on the line.Any text

Resource​

The operations and their resources. The Resource link opens the hours.

FieldWhat it meansWhat to put
OperationOperation.Filled in by the system
NameName.Filled in by the system
ResourceResource.
SequenceThe order of the step.A number. Filled in by the system
NameName.Filled in by the system
Sequence RuleRule.Filled in by the system
UnitUnit.Filled in by the system
Plan HourPlanned hours.Filled in by the system
Plan HourPlanned hours.Filled in by the system
Actual HourActual hours.Hours
Actual HourActual hours.Filled in by the system
Additional HourExtra hours.Filled in by the system
Hour VarianceVariance.Filled in by the system
Plan CostPlanned cost.Filled in by the system
WarehouseWarehouse.
ResourceLink. Opens the resource hours and cost.Filled in by the system
Line TextA note on the line.Any text

Planned and actual hours per resource; the actual cost of setup, run, wait and move time is posted.

FieldWhat it meansWhat to put
Resource GroupGroup.
NameName.Filled in by the system
ResourceResource.
UnitUnit.Filled in by the system
SequenceSequence.Filled in by the system
FixedFixed time.Filled in by the system
Plan HourPlanned.Filled in by the system
Actual HourActual.Hours
Hour VarianceVariance.Filled in by the system
Plan CostPlanned cost.Filled in by the system
Line TextA note on the line.Any text

How to configure it​

On Manufacture and Controlling Setting: the three journals (or per site), the flushing override, yield calculation, and hiding the Consume part.

Scenarios​

  • A factory confirms output at shift end. One confirmation per shift with that shift's quantity; the order closes when the total is reached.
  • A component was over-used. Enter the actual quantity and a variance reason on the Consume line.

What it is connected to​

If something looks wrong​

  • "Production Order not found" Pick a valid order.
  • "Confirmation date cannot be smaller then Production Date" Use a date on or after the order date.
  • "Component Lines Data cannot be Empty" Add output lines.
  • "Confirm Quantity is not matching with Confirm lines" The output and co-product lines must add up to Confirmation Quantity.
  • "Production Confirmation - Line ID: ... - Unit cannot be Empty" Fill the unit of the consumption line.
  • "Confirm - Line ID: ... - Confirm Quantity: ... cannot exceed Production Order Quantity: ..." More than what is left on the order.
  • "Please Define Issuance Journal in Setting" Set Journal For Issuance on the manufacturing setting.
  • "Please Define Resource Journal in Setting" Set Journal for Resource.
  • "Resource ... Debit Account is not Configured" / "... Credit Account is not Configured" Give the resource its accounts (company setup).
  • "Serial Production is not configured" A serial-tracked output cannot be confirmed.
  • "Batch Number is Mandatory" / "Batch Date is Mandatory" / "Batch Expiry Date is Mandatory" / "Batch Before Date is Mandatory" Fill what the item's tracking structure asks for.
  • "Production Item ... Default Warehouse is not defined" Give the item a default warehouse.
  • "Item: ... Manufacturing Type is not defined in Item in Legal Entity" Set Type on the item.
  • The finished good did not come into stock. Journal For Receive is empty on the setting; nothing is received automatically. Receive it on the production receipt screen in inventory.
  • "There are some Receipt created against this confirmation (...)" on Reverse. Reverse those receipts first.
  • "Reverse Date: ... cannot be less than Posting Date: ..." Use a later reverse date.