Resource
A resource is something that does work and costs money by the hour: a machine, a person, a work centre. It belongs to a resource group, sits at a site, and carries its hourly cost, calendar and capabilities.
What it is for
Resource Type, Resource Group and Sub Group are chosen before Create and locked afterwards. On Create the costing lines, the hourly cost and the unit text are copied from the group; changing Standard Cost Per Hour on a line re-adds Per Hour Cost.
What the screen shows depends on the type: the machine type (code M) adds the Component and Machine Details tabs; the person type (code W) shows Employee, and picking an employee fills the resource code and name from it; only the type with code L can be ticked Work Center.
Every field in plain words
General
| Field | What it means | What to put |
|---|---|---|
| Resource | The resource code. | Typed on New, or filled from Employee. Locked after Create. |
| Name | The resource’s name. | Required. |
| Resource Type | The type of resource. | Required. Fixed list. Locked after Create. |
| Resource Group | The group it belongs to. | Required. Locked after Create. |
| Resource Sub Group | Its sub group. | Optional. Locked after Create. |
| Quantity | How many of this resource there are. | A number. Movements in and out change what is available. |
Costing
| Field | What it means | What to put |
|---|---|---|
| Unit Of Measure, Text | The unit the resource is measured in, as text. | Required unless the type is L. Copied from the group. |
| Time Per Resource Unit | Time one unit takes. | Optional. A number. |
| Per Unit Quantity | Quantity per unit. | Copied from the group. |
| Per Hour Cost | Cost per hour. | The sum of Standard Cost Per Hour on the costing lines. |
| Site | The site where the resource is. | Required. Pick from the Site list. |
| Manufacturing Unit | The manufacturing unit it belongs to. | Optional. Pick from the Manufacturing Unit list. |
| Work Center | The resource is a work centre. | Only for type L. |
| Work Center | The work centre this resource works in. | Optional. Pick from the list. |
Costing
Costing lines, copied from the group on Create.
| Column | What it means | What to put |
|---|---|---|
| Cost Object | A cost object. | Optional. Pick from the Cost Object list. |
| Name | Its name. | Optional. |
| Standard Cost Per Hour | Its cost per hour for this resource. | Optional. |
| Line Text | A note. | Optional. |
Machine Details
| Field | What it means | What to put |
|---|---|---|
| Resource Location | Where the machine is installed. | Optional. Pick from the list. |
| Key Value | A key value. | Locked after the first save. |
| Manufacturer | Maker. | Optional. Pick from the Manufacture list. |
| Model | Model. | Optional. Pick from the Model list. |
| Part Number | Part number. | Optional. |
| Country of Manufacture | Country of make. | Optional. Pick from the Country list. |
| Month of Construction | Month built. | Optional. |
| Year of Construction | Year built. | Optional. |
| Serial Number | Serial number. | Optional. |
| Acquisition Value | What it cost. | Optional. A number. |
| Acquisition Currency | Currency of that cost. | Optional. Pick from the Currency Legal Entity list. |
| Acquisition Date | When it was bought. | Optional. A date. |
| Warranty Start | Customer warranty start. | Optional. A date. |
| Warranty End | Customer warranty end. | Optional. A date. |
| Inherit Warranty | Customer warranty inherited. | Tick or leave clear. |
| Master Warranty | Customer master warranty. | Optional. |
| Pass on Inventory | Pass the customer warranty on. | Tick or leave clear. |
| Warranty Start | Vendor warranty start. | Optional. A date. |
| Warranty End | Vendor warranty end. | Optional. A date. |
| Inherit Warranty | Vendor warranty inherited. | Tick or leave clear. |
| Master Warranty | Vendor master warranty. | Optional. |
| Pass on Inventory | Pass the vendor warranty on. | Tick or leave clear. |
Component
Component (machine type).
| Column | What it means | What to put |
|---|---|---|
| Component | A component of the machine. | Optional. Pick from the list. |
| Component Description | Its description. | Optional. |
| Line Text | A note. | Optional. |
Calendar
Calendar.
| Column | What it means | What to put |
|---|---|---|
| Calendar | The working calendar for a date range. Required. | Required. Pick from the Calendar list. |
| Date From | From. Required. | Required. |
| Date To | To. Ranges of different calendars may not overlap. | Optional. |
Resource Capability
Resource Capability: what the resource can do. Nothing reads this grid today.
| Column | What it means | What to put |
|---|---|---|
| Resource Capability | A capability, from Resource Capability. | Required. Pick from the Resource Capability list. |
| Level | The level of that capability. | Required. |
How to configure it
The screen allows import, so a long list can be loaded from a file instead of typed. Which fields are required, greyed, hidden or pre-filled for a company is set on Organizational Structure Setting, in its Default Parameters grid, and one user can differ through User Parameter Value.
What it is connected to
- Resource Movement and Resource Assignment - move and assign it.
- Resource Capability - what it can do.
- Calendar - when it works.
- Picked on Time Sheet in Assets and projects.
- Picked on these company setup screens: Resource Assignment, Resource Movement, Resource Reading.
- Picked on Manufacture Operation Confirmation, Manufacture Order Confirmation, Manufacturing Order, Routing in Products and manufacturing.
- Picked on Billing Proposal, Fleet Maintenance Order, Fleet Maintenance Quotation, Maintenance Order, Maintenance Order Confirmation, Maintenance Plan - Measuring Based, Maintenance Plan - Schedule, Maintenance Plan - Time Based, Resource, Resource Reading Setup in Service and maintenance.
- Manufacture Order Confirmation - the confirmation posts the resource voucher to the resource's debit and credit accounts; see Plan to produce.
If something looks wrong
- “Date From cannot be after Date To” A calendar line ends before it starts.
- “Calendar - Line ID: … overlaps with Line ID: …” Two calendar lines overlap.
- The Component and Machine Details tabs are missing. They show only for the machine type.