Resource Group

A resource group is a family of resources, such as CNC machines or welders. Its Costing tab lists the cost objects and their cost per hour; a new resource in the group starts from these costs.

Where
Organizational Structure › Resource; Product Information › Resource; Manufacturing › Resource; Project Accounting › Resource (OSSG)
Who uses it
The cost accountant or production planner
When
Once, while the company is being set up, and whenever a new one is needed
Needs first
Cost Object

What it is for​

Each costing line names a cost object with a Cost Key, a Cost Category (Fixed or Variable), a Cost Basis (Setup, Operation, Queue or Move time) and a Cost Per Hour. The header adds them up as you type:

  • Per Hour Cost Fixed and Per Hour Cost Variable: the lines of each cost category; Per Hour Cost is the two together.
  • Setup Time, Operation Time, Quenue time, Move Time: the lines of each cost basis. They are shown for the machine and person resource types only.

When a Resource is created in the group, its costing lines and hourly cost are copied from here.

Every field in plain words​

General​

FieldWhat it meansWhat to put
Resource GroupThe group code.Typed on New.
NameThe group’s name.Required. Locked after the first save.
Resource TypeThe type of resource the group holds.Pick from the fixed list. Locked after the first save.

Costing​

FieldWhat it meansWhat to put
Setup TimeCost per hour of the lines whose basis is setup time.Adds itself up.
Operation TimeCost per hour of the operation time lines.Adds itself up.
Quenue timeCost per hour of the queue time lines.Adds itself up.
Move TimeCost per hour of the move time lines.Adds itself up.
Per Hour Cost VariableTotal of the Variable lines.Adds itself up.
Per Hour Cost FixedTotal of the Fixed lines.Adds itself up.
Per Hour CostFixed plus variable.Adds itself up.

Costing​

Costing lines.

ColumnWhat it meansWhat to put
Cost KeyHow the cost is classified, from a fixed list.Required.
Cost CategoryFixed or Variable.Required.
Cost ObjectThe cost object.Optional. Pick from the Cost Object list.
NameIts name; fills itself.Optional.
Cost BasisWhich time the cost runs on: setup, operation, queue or move.Optional. Pick from the list.
Cost Per HourCost per hour.Optional.
Line TextA note.Optional.

How to configure it​

Which fields are required, greyed, hidden or pre-filled for a company is set on Organizational Structure Setting, in its Default Parameters grid, and one user can differ through User Parameter Value.

What it is connected to​

  • Picked on Project Estimation, Project Quotation, Time Sheet in Assets and projects.
  • Picked on these company setup screens: Category Pricing, Resource Sub Group, Resource.
  • Picked on Manufacture Operation Confirmation, Manufacture Order Confirmation, Manufacturing Order, Routing in Products and manufacturing.
  • Picked on Billing Proposal, Fleet Maintenance Order, Fleet Maintenance Quotation, Fleet Service, Maintenance Order Confirmation, Maintenance Plan - Measuring Based, Maintenance Plan - Time Based, Operation, Service Agreement, Service Order, Service Quotation in Service and maintenance.

If something looks wrong​

  • The time fields are missing from the header. They are shown only for the machine and person resource types.
  • Nothing on this screen refuses a save beyond the required fields.