Resource Assignment
Resource Assignment records which resources are assigned to a project for a period, and who is responsible.
What it is for
It is a record for planning and reporting: the Resource Assignment list and report read it. It does not change quantities and posts nothing.
Every field in plain words
General
| Field | What it means | What to put |
|---|---|---|
| Transaction | The assignment number. | Shown once the assignment is created. |
| Transaction Date | The date of the assignment. | Required. Locked after Create. |
| Date From | Start of the assignment. | Optional. A date. |
| Date To | End. | Optional. A date. |
Controlling
| Field | What it means | What to put |
|---|---|---|
| Project | The project. | Optional. Pick from the Project list. |
| Responsible | Who is responsible. | Optional. Pick from the Responsible list. |
Basic Data
Basic Data.
| Column | What it means | What to put |
|---|---|---|
| Resource | The resource. | Optional. Pick from the Resource list. |
| Name | Its name. | Optional. |
| Line Text | A note. | Optional. |
How to configure it
Which fields are required, greyed, hidden or pre-filled for a company is set on Organizational Structure Setting, in its Default Parameters grid, and one user can differ through User Parameter Value.
What it is connected to
- Lists and reports: see Lists and reports.
If something looks wrong
- “Similar Transaction. already exits” The number is already used.