Resource Assignment

Resource Assignment records which resources are assigned to a project for a period, and who is responsible.

Where
Organizational Structure › Resource Assignment (OSAS)
Who uses it
The project or site manager
When
When resources are committed to a project
Needs first
Resource

What it is for​

It is a record for planning and reporting: the Resource Assignment list and report read it. It does not change quantities and posts nothing.

Every field in plain words​

General​

FieldWhat it meansWhat to put
TransactionThe assignment number.Shown once the assignment is created.
Transaction DateThe date of the assignment.Required. Locked after Create.
Date FromStart of the assignment.Optional. A date.
Date ToEnd.Optional. A date.

Controlling​

FieldWhat it meansWhat to put
ProjectThe project.Optional. Pick from the Project list.
ResponsibleWho is responsible.Optional. Pick from the Responsible list.

Basic Data​

Basic Data.

ColumnWhat it meansWhat to put
ResourceThe resource.Optional. Pick from the Resource list.
NameIts name.Optional.
Line TextA note.Optional.

How to configure it​

Which fields are required, greyed, hidden or pre-filled for a company is set on Organizational Structure Setting, in its Default Parameters grid, and one user can differ through User Parameter Value.

What it is connected to​

If something looks wrong​

  • “Similar Transaction. already exits” The number is already used.