Time Sheet

A Time Sheet records the hours resources worked, for a range of days or for time slots within one day. Each line is one resource; each column is one day or one slot. On Save the hours are written out one line per resource per day or slot, which is what the project's Resources tab and the Time Sheet list read.

Where
Project Accounting › Project › Time Sheet
Who uses it
The site supervisor, the project administrator
When
Daily or weekly, as work is done
Needs first
Resources and resource groups; the Project

What it is for​

The time sheet is the record of hours. It does not cost them and posts nothing.

The rule people get wrong: as delivered, the Project and Category columns of the lines are hidden by the configuration, so a line cannot name a project and its hours reach no project. See If something looks wrong.

Every field in plain words​

FieldWhat it meansWhat to put
Time Sheet NoThe numberRequired unless the company numbers time sheets automatically
Resource TypeWhat is being timedRequired. Worker, Machine, Tool or Location
Time Sheet FormatDays or time slotsRequired. Date (the default) or Time
Date From, Date ToThe days covered, for format DateAt most 48 days apart
Date From, Time From, Time ToThe day and the hours covered, for format TimeTime To after Time From
Interval (Months)The length of one slot, for format TimeIn hours, despite the label: 0.5 to 20

The header is chosen before Create and fixed after it: the columns are built from it.

Lines​

ColumnWhat it means
Resource Group, Resource, NameWho or what worked
Service OrderA service order the hours belong to
TotalThe sum of the slot columns, worked out
One column per day or slotHeaded with the date (format Date) or the time range (format Time). Hours per day for Date; minutes per slot for Time

The arithmetic​

  • Format Date: one column per day from Date From to Date To. A cell takes at most 24.
  • Format Time: one column per Interval between Time From and Time To, at most 48 columns. A cell takes at most Interval x 60 minutes.
  • Total = the sum of the line's cells. Lists turn minutes into hours.

How to configure it​

Make resources and resource groups. To book hours to projects, the Project and Category columns of the lines must be shown by the configuration; a company setting cannot show a column the configuration hides.

Scenarios​

  • A crew's week on site. Resource Type Worker, Format Date, Monday to Saturday. One line per worker, hours per day.
  • A crane booked by the hour on one day. Resource Type Machine, Format Time, 08:00 to 17:00, Interval 1. One line, minutes per slot.

What it is connected to​

If something looks wrong​

  • "Difference between Field: Date From & Field: Date to should be less than 48". Split the period into two time sheets.
  • "Field: Time To cannot be less than Field: Time From". Swap the times.
  • "Difference between Field: Time From & Field: Time to should be less than 48". Too many slots: widen the Interval or shorten the hours.
  • "There can not be more than 24 hours in a day". A day cell over 24. The cell is reset to 0.
  • "There can not be more than ... minutes". A slot cell over the interval in minutes. The cell is reset to 0.
  • Hours do not show on the project. The lines carry no project: the Project column is hidden as delivered. Ask for the column to be shown in the configuration.