Skip to main content

Production Order Periodic Settlement

A settlement up to a date: for each confirmation of a closed manufacturing order not yet settled, the actual material, labour and machine cost against the standard cost, and the variance. Save posts it.

Where
Manufacturing › Manufacture
Who uses it
The cost accountant
When
At period end
Needs first
Closed manufacturing orders with confirmations; a voucher journal (JV)

What it is for​

Enter Till Date, Posting Date and the Transaction Journal and press Create. The lines are filled with every confirmation dated up to Till Date, of a Closed order, not yet on a settlement that is not reversed:

  • Actual Item Cost: the value of the components the confirmation issued.
  • Actual Labor Cost: the resource cost of resources of type W; Actual Machine Cost: of the other resource types.
  • Standard Cost: the value of the output received.
  • Total Actual Cost is the sum of the three, Cost Variance is Standard Cost minus Total Actual Cost, and Cost Variance % is that difference over Total Actual Cost, shown as a positive percentage.

The header is fixed after Create. Save posts a voucher through the journal, using the posting keys set up for this screen in the general ledger. The business layer can reverse a posted settlement (with a reverse date not before the posting date), but Reverse is not switched on for this screen in the standard configuration.

Every field in plain words​

FieldWhat it meansWhat to put
TransactionThe settlement number.Given on Create. Required
Posting DatePosting date.A date. Required
Till DateConfirmations up to this date.A date. Required
NotesNotes.Any text
Transaction JournalThe voucher journal.A JV journal. Required
JournalIts nature.Filled in

Lines​

One line per confirmation.

FieldWhat it meansWhat to put
Manufacturing OrderOrder.Filled in by the system
ConfirmationConfirmation.Filled in by the system
Item NoItem.Filled in by the system
Item VariantVariant.Filled in by the system
NameName.Filled in by the system
Actual Item CostComponents issued.Calculated
Actual Labor CostResources of type W.Calculated
Actual Machine CostOther resources.Calculated
Total Actual CostSum.Calculated
Standard CostOutput received.Calculated
Cost VarianceStandard minus actual.Calculated
Cost Variance %Variance over actual.Calculated
Line TextA note on the line.Any text. Filled in by the system

How to configure it​

The accounts come from the posting keys of this screen in the general ledger setup.

Scenarios​

  • A plant values finished goods at standard and wants the month's variance in the books. At month end, one settlement up to the last day.

What it is connected to​

If something looks wrong​

  • "No Production Order Confirmation found" on Create. No confirmation of a closed order up to that date is left to settle.
  • "Lines cannot be empty" Nothing to settle.
  • "Only Posted Vouchers can be reversed" Only a posted settlement can be reversed.
  • "Reverse Date: ... cannot be less than Posting Date: ..." Use a later date.
  • "Journal: ... does not exists." / "Journal: ... is not defined." Pick a valid journal.