How do I set up a bill of material?
Make a BOM usage, then on Bill Of Material pick the item and usage, press Create, add the components, and tick Approved.
Before you start
- The finished item released with Replenishment for manufacturing, BOM Unit, Type BOM (FOR for a formula) and a Manufacturing Category.
- Components released in the company.
- A Routing if operations and resource hours are to be costed.
Steps
- On Usage, make a usage of Type BOM with Production ticked.
- Open Bill Of Material, pick the Usage, the Item, Valid From and Valid To and the Site, then Create. The item locks.
- Set Quantity: the output quantity the lines are for.
- Add the components: item, unit, Quantity, Scrap % if any, Flushing Indicator B (issued automatically on confirmation) or M (by hand), and the Operation when a routing is named.
- Tick Approved (or send it for approval when an approval is set up) and Save.
Check it worked
- On a new manufacturing order for the item, the BOM is offered in Bom/Formula, and its lines come in multiplied by the order quantity.
If something looks wrong
- The BOM is not offered on the order. It is not approved, not valid on the order date, for another site, or its usage is Costing, Template or Subcontracting.
- A question about an alternate BOM on Save. Another BOM of the item overlaps the dates.