A resource is one machine, tool or person in the plant. It is what a maintenance request, order, reading or plan is about.

Where
Plant Maintenance › Resource › Resource
Who uses it
The maintenance planner
When
At setup, and when equipment is added
Needs first
Resource Group, sites and warehouses in Inventory, calendars in Company Setup

What it is for​

Resource Type, Resource Group and Site are required. Picking the group fills the costing from it. The Calendar tab gives working calendars by date; two calendar lines may not overlap ("Calendar - Line ID: … overlaps with Line ID: …") and Date From cannot be after Date To ("Date From cannot be after Date To"). A resource code must be unique ("Resource Cannot be Duplicate").

The warranty and acquisition fields are recorded only.

The Component tab has no column registration for this screen in this release and shows nothing; components named on maintenance orders come from the resource as kept elsewhere.

Every field in plain words​

General​

FieldWhat it meansWhat to put
ResourceThe code or number of this recordA short unique code, or the next number when a number range is set up. Cannot be changed once saved
NameName of the resourceFills in by itself. Required
Resource TypeType of the resource: machine, person, toolPick from the delivered list. Cannot be changed once saved. Required. Cannot be changed once saved
Resource GroupThe resource groupPick a resource group. Required. Cannot be changed once saved
Resource Sub GroupThe sub-groupPick a sub-group. Cannot be changed once saved
QuantityHow manyA number greater than zero

Costing​

FieldWhat it meansWhat to put
Unit Of Measure, TextUnit the cost is perFills in from the resource group. Required
Time Per Resource UnitTime per resource unitA number
Per Unit QuantityQuantity per unitFills in from the resource group
Per Hour CostCost per hourFills in from the resource group

Basic Data​

FieldWhat it meansWhat to put
SiteThe sitePick a site. Required
Manufacturing UnitManufacturing unitPick a manufacturing unit
Work CenterThe resource is a work centerFills in by itself

Input​

FieldWhat it meansWhat to put
Input WarehouseWarehouse materials come fromPick a warehouse
Storage LocationStorage location materials come fromPick a location

Output​

FieldWhat it meansWhat to put
Output WarehouseWarehouse output goes toPick a warehouse
Storage LocationStorage location output goes toPick a location

Machine Details​

FieldWhat it meansWhat to put
Resource LocationWhere the resource isPick a location
Key ValueKey value of the resourceFills in by itself. Cannot be changed once saved

Manufacture​

FieldWhat it meansWhat to put
ManufacturerThe manufacturerPick from Manufacture
ModelThe modelPick from Model
Part NumberPart numberFree text
Country of ManufactureCountry of manufacturePick a country
Month of ConstructionMonth builtFree text
Year of ConstructionYear builtFree text
Serial NumberSerial numberFree text

Reference​

FieldWhat it meansWhat to put
Acquisition ValuePurchase valueA number. Recorded only
Acquisition CurrencyCurrency of the purchase valuePick a currency
Acquisition DatePurchase dateA date

Customer Warranty​

FieldWhat it meansWhat to put
Warranty StartStart of the warranty given to customersA date. Recorded only
Warranty EndEnd of the warranty given to customersA date. Recorded only
Inherit WarrantyRecorded on the resourceRecorded only
Master WarrantyMaster warrantyRecorded only
Pass on InventoryPass on inventoryRecorded only

Vendor Warranty​

FieldWhat it meansWhat to put
Warranty StartStart of the supplier's warrantyA date. Recorded only
Warranty EndEnd of the supplier's warrantyA date. Recorded only
Inherit WarrantyInherit warrantyRecorded only
Master WarrantyMaster warrantyRecorded only
Pass on InventoryPass on inventoryRecorded only

Costing​

ColumnWhat it meansWhat to put
Cost ObjectCost objectPick a cost object
NameName of the cost objectFills in by itself
Standard Cost Per HourStandard cost per hourA number
Line TextA note on the lineFree text

Calendar​

ColumnWhat it meansWhat to put
CalendarWorking calendar for a periodPick a calendar. Required
Date FromStart of the calendar periodA date. Required
Date ToEnd of the periodA date

Resource Capability​

ColumnWhat it meansWhat to put
Resource CapabilityA capability of the resourcePick a capability. Required
LevelLevel of the capabilityFree text. Required

How to configure it​

Fill the Machine Details tab for equipment you maintain. Give Manufacturer and Model so plans can target them.

Scenarios​

  • A bottling plant registers its filler machine. Resource type machine, group "Fillers", site, manufacturer and model, serial number, a working calendar.

What it is connected to​

If something looks wrong​

  • Save is refused with "Resource Cannot be Duplicate". The code exists.
  • Save is refused with "Calendar - Line ID: … overlaps with Line ID: …". Two calendar periods overlap.
  • The Component tab is empty. Broken as shipped in this release.