Skip to main content

Resource Group

A resource group gathers similar resources ("CNC machines", "electricians") and holds their costing lines.

Where
Plant Maintenance › Resource › Resource Group
Who uses it
The maintenance planner, the cost accountant
When
At setup
Needs first
Cost objects in Company Setup

What it is for​

The group is required on every Resource; a resource takes its costing (unit, per hour cost, cost objects) from its group. Maintenance plans can target all resources of a group.

The code must be unique: "Resource Group Cannot be Duplicate".

Every field in plain words​

General​

FieldWhat it meansWhat to put
Resource GroupThe code or number of this recordA short unique code, or the next number when a number range is set up. Cannot be changed once saved
NameName of the resource groupFills in by itself. Required
Resource TypeType of resources in the groupPick from the delivered list

Costing​

ColumnWhat it meansWhat to put
Cost KeyCost keyFills in by itself. Required
Cost CategoryCost categoryFills in by itself. Required
Cost ObjectCost objectPick a cost object
NameName of the cost objectFills in by itself
Cost BasisBasis of the costPick from the list
Cost Per HourCost per hourA number
Line TextA note on the lineFree text

How to configure it​

Add the costing lines on the Costing tab: cost object and cost per hour.

Scenarios​

  • A plant costs machine time at different hourly rates. One group per machine family with its cost per hour.

What it is connected to​

If something looks wrong​

  • Save is refused with "Resource Group Cannot be Duplicate". The code exists.