Maintenance Order Confirmation

A confirmation records progress on one operation of a maintenance order: whether it is complete, how much work remains, who worked how long, and what items were used.

Where
Plant Maintenance › Process › Maintenance Order Confirmation
Who uses it
The technician, the maintenance planner
When
As each operation is done
Needs first
Maintenance Order

What it is for​

Pick the Maintenance Order, then an Operation: only operations not yet confirmed as completed are offered. Tick Completed when the operation is finished (Remaining Work becomes 0). The Resource Utilization tab records who worked and how long; the Item tab what was used (item and quantity above zero).

Saving a confirmation does not issue the items from stock and posts nothing. Issue spare parts with an inventory issue (Item Issue).

Every field in plain words​

General​

FieldWhat it meansWhat to put
ConfirmationThe code or number of this recordA short unique code, or the next number when a number range is set up. Cannot be changed once saved
Confirmation DateDate of the confirmationA date. Required
NotesA note on the documentFree text

Operation​

FieldWhat it meansWhat to put
OperationThe operation (a unit of work)Pick an operation
SequenceOrder of the lineFills in by itself
CompletedThe operation is finishedTick when done; Remaining Work becomes 0
Remaining UnitUnit of the remaining workPick a unit
Remaining WorkWork still to doA number
ResponsibleThe person responsiblePick from the responsible persons list

Internal Reference​

FieldWhat it meansWhat to put
Maintenance OrderThe maintenance orderPick an order. Required. Cannot be changed once saved

Resource Utilization​

ColumnWhat it meansWhat to put
Resource GroupThe resource groupPick a resource group
ResourceThe resource: a machine, a person, a toolPick a resource
Work CenterThe work centerPick a work center
Date FromStart of the periodA date
Date ToEnd of the periodA date
Duration UnitUnit of the durationPick a unit, such as hours
DurationHow long the work takesA number, in the duration unit
Duration Length UnitUnit of the elapsed lengthPick a unit
Duration LengthElapsed length of the workA number
ResponsibleThe person responsiblePick from the responsible persons list
Line TextA note on the lineFree text

Item​

ColumnWhat it meansWhat to put
Special IndicatorSpecial stock indicatorFills in by itself
Item NoThe item (part or material)Pick an item. Required
Item VariantThe item variantFills in by itself
SiteThe siteFills in by itself
WarehouseThe warehouseFills in by itself
Storage LocationStorage locationFills in by itself
Movement UnitUnit usedPick a unit
Movement QuantityQuantity usedA number greater than zero
Batch/Serial NumberBatch or serial numberFills in by itself
Batch DateBatch dateFills in by itself
Batch Expiry DateBatch expiryFills in by itself
Line TextA note on the lineFree text

How to configure it​

Nothing to set.

Scenarios​

  • The fitter finished replacing the seal in 3 hours with one seal. Confirmation for that operation, Completed, 3 hours on Resource Utilization, the seal on Item.

What it is connected to​

If something looks wrong​

  • The operation is not offered. It already has a completed confirmation.
  • Save is refused with "Maintenance Order: Item Lines - Line ID: … - Item cannot be Empty" or "… Quantity cannot be Zero or Negative". Complete the item line.
  • Stock did not go down. The confirmation does not issue stock; post an inventory issue.