Maintenance Strategy

A strategy lists the cycles preventive work follows: "monthly", "quarterly", "yearly". A maintenance plan takes its cycles from a strategy.

Where
Plant Maintenance › Maintenance Strategy › Maintenance Strategy
Who uses it
The maintenance planner
When
At setup
Needs first
Nothing

What it is for​

Each line is one cycle. Value is how often it falls, counted in the plan's scheduling periods: 1 every period, 3 every third period. Initiation Horizon % decides how far before the plan date the call date comes.

Rules on save:

  • At least one line ("Maintenance Strategy Lines cannot be empty").
  • A Strategy Plan code once only ("Line ID: … Plan is duplicated with Line ID: …"), and without spaces.
  • Hierarchy not greater than Sequence.

Every field in plain words​

General​

FieldWhat it meansWhat to put
Maintenance StrategyThe code or number of this recordA short unique code, or the next number when a number range is set up. Cannot be changed once saved
NameThe nameFree text. Required. Cannot be changed once saved
Strategy IndicatorWhether the strategy counts time or meter readingsPick from the delivered list. Cannot be changed once saved. Required. Cannot be changed once saved

Basic Data​

FieldWhat it meansWhat to put
Strategy UnitUnit of the strategy cyclesPick a unit. Cannot be changed once saved
Initiation Horizon %How early, as a percentage of the cycle, the call date comes before the plan dateA percentage

Tolerance Limit​

FieldWhat it meansWhat to put
Tolerance Threshold Late %Late toleranceA percentage. Recorded only
Tolerance Threshold Early %Early toleranceA percentage. Recorded only

Cycles​

ColumnWhat it meansWhat to put
SequenceOrder of the lineA number
UnitUnit of the cycleRequired
Strategy PlanCode of one cycle of the strategyA code without spaces. Required
NameName of the cycleFree text. Required
ValueEvery how many periods the cycle fallsA whole number, for example 3 for every third period
HierarchyRank of the cycleA number not greater than Sequence
Initiation Horizon %How early, as a percentage of the cycle, the call date comes before the plan dateA percentage
Line TextA note on the lineFree text

How to configure it​

Pick the Strategy Indicator first; it cannot be changed once saved.

Scenarios​

  • Monthly greasing, quarterly inspection, yearly overhaul. Three lines with Value 1, 3 and 12 on a strategy counted in months.

What it is connected to​

If something looks wrong​

  • Save is refused with "Basic Data - Line ID: … - Hierarchy cannot be greater than Sequence". Lower the hierarchy.
  • Save is refused with "Basic Data: Line ID: … - … - Remove Space From Strategy Plan ". Remove the space from the code.