Maintenance Plan - Time Based

A time-based plan schedules preventive work by the calendar: from a start date, for a number of periods of a day, month or year.

Where
Plant Maintenance › Maintenance Plan › Maintenance Plan - Time Based
Who uses it
The maintenance planner
When
At setup, and when the plant adds equipment
Needs first
Maintenance Strategy, Resource, Operation

What it is for​

A plan says which resources get which operations, on which cycles of a strategy.

  1. Fill the header and at least one Parameter (resource group, resource, key value, manufacturer or model): the plan covers every resource that matches all the parameters given. Create is refused otherwise ("Atleast one field select in Paramenters").
  2. Pick the Maintenance Strategy. On Create, its cycles become columns of the operation grid.
  3. On each operation line, switch on the cycles the operation belongs to. Open Items to list the parts the operation needs.
  4. Save. Then run Maintenance Plan - Schedule to produce the dated visits.

A schedule run copies the plan as it is at that moment; changing the plan later does not change a schedule already run.

Scheduling Unit sets the period: a day, a month (30 days) or a year (365 days). Scheduling Period is how many periods to plan. Of the three scheduling indicators, ticking one clears the other two; only Time is used when the schedule is worked out.

Every field in plain words​

General​

FieldWhat it meansWhat to put
Maintenance PlanThe code of the planA short unique code. Required. Cannot be changed once saved
NameName of the planFree text. Required
Schedule Start DateDate the schedule counts fromA date. Required
Scheduling PeriodHow many periods to scheduleA whole number. Required
Scheduling UnitLength of one period: day, month or yearPick from the list. A month counts as 30 days, a year as 365. Required

Scheduling Indicator​

FieldWhat it meansWhat to put
TimeSchedule by timeTick; the other two indicators clear
Time-Key DateSchedule by key dateTick; the other two clear. Recorded only
Time Factory CalendarSchedule by factory calendarTick; the other two clear. Recorded only

Parameters​

FieldWhat it meansWhat to put
Resource GroupThe resource groupPick a resource group
ResourceThe resource: a machine, a person, a toolPick a resource
Key ValueKey value of the resourceFills in by itself
ManufacturerThe manufacturerPick from Manufacture
ModelThe modelPick from Model

Maintenance Strategy​

FieldWhat it meansWhat to put
Maintenance StrategyThe strategy whose cycles the plan usesPick from Maintenance Strategy. Cannot be changed once saved. Required. Cannot be changed once saved

Operations (Basic Data tab)​

One column per cycle of the strategy is added after Create; switch on the cycles the operation belongs to.

ColumnWhat it meansWhat to put
OperationThe operation (a unit of work)Pick an operation
NameName of the operationFills in by itself
Duration UnitUnit of the durationPick a unit, such as hours
DurationHow long the work takesA number, in the duration unit
ItemsItems needed for the operationOpen it and list them

Items (opened from an operation line)​

ColumnWhat it meansWhat to put
Item NoThe item (part or material)Pick an item
NameName of the itemFills in by itself
UnitUnit of measurePick a unit
QuantityHow manyA number greater than zero
Line TextA note on the lineFree text

How to configure it​

Plan per family of equipment rather than per machine: a resource group with a model is usually enough.

Scenarios​

  • All compressors of one model need monthly checks and a yearly overhaul for two years. Plan with parameter Model, strategy "M/Y", start date 1 January, Scheduling Unit month, Scheduling Period 24; the check operation on the monthly cycle, the overhaul on the yearly one.

What it is connected to​

If something looks wrong​

  • Create is refused with "Atleast one field select in Paramenters". Give at least one parameter.