How do I hold received goods until quality has passed them?
Mark the item as needing quality, set up an inspection group and a quality point for its receipt movement and site. Each receipt then lands in quality status with an inspection order; releasing the order opens or rejects the batch.
Before you start
- The item needs quality, on the item: see Item In Legal Entity.
- Inspection journals are named on the Inventory Control Setting.
Steps
- Create the tests on Inspection and the sample size on Sampling Instruction.
- Create the Inspection Group: headings, tests in sequence, limits, Required Mandatory.
- Create the Quality Point for the item (or its quality group), module, site, receipt movement and inspection group. Set Process Block to invoice if the vendor invoice must wait.
- Receive the goods. The line goes to quality status and an inspection order appears.
- Open the Quality Inspection Order, enter results, Save, and release it.
Check it worked
- As On Inventory with View Stock Status shows the batch as open (passed) or rejected (failed).
If something looks wrong
- "Quality Point is not configured of item ..." at receipt - step 3 is missing for that site and movement.
- The batch stays in quality. The inspection order is saved but not released.