Inspection Group
The test plan. It lists, under headings, the inspections to run in order, with what counts as a pass for each, and the sampling instruction for the sample.
Every field in plain words
Header
| Field | What it means | What to put |
|---|---|---|
| Inspection Group, Name | The plan | Required |
| Sampling Instruction | How much is sampled | Required |
| Specification, STP, Reference | Document references | Copied onto each inspection order |
| Acceptable Result | Recorded | Not used to decide pass or fail |
| Destructive Inspection | Recorded | Nothing reads it |
| Block |
Headings and inspections
Each Heading groups Inspections. Per inspection:
| Field | What it means |
|---|---|
| Sequence | Order of the tests. Required |
| Inspection | The test. Required |
| Required Mandatory | Counts toward pass or fail |
| Inspection Instrument, Inspection Method | How it is done |
| Value, Tolerance From %, Tolerance To % | For a Value test: passes within the tolerance around the value |
| Range From, Range To | For a Range test: passes inside the range |
| Option (sub-grid: Value, Accepted) | For an Option test: passes when an Accepted option is chosen |
| Tag, Default, Rounding Precision, Details | Printing and entry aids |