How do I record hours worked on a project?
On Time Sheet pick the Resource Type and the format (Date for days, Time for slots in one day), the dates or times, Create, then type the hours per resource per column. As delivered the lines cannot name a project: the Project column is hidden by the configuration.
Steps
- Open Time Sheet, New. Resource Type, Time Sheet Format, Date From and Date To (at most 48 days) or Time From, Time To and Interval. Create.
- Add a line per resource and type the hours in each day column (minutes per slot for the Time format).
- Save. The hours are written out one line per resource per day or slot.
Check it worked
- The Time Sheet list shows the hours.
Nothing in this task posts to the accounts.
If something looks wrong
- "There can not be more than 24 hours in a day". Fix the cell.
- Hours show under no project. The Project column is hidden as delivered; the configuration must show it before hours can be booked to a project.