Move the lead into the stage whose Stage Type is Won (or Lost) on its pipeline. Won Date (or Lost Date) is set to today, a won lead's Close Date becomes the same day, and a won lead is locked.
Steps
- Move the lead into the Won or Lost stage, as in Move a lead to another stage.
- Check the dates. Won Date is today and Close Date matches it; or Lost Date is today.
What a won lead can no longer do
- Edit and Delete are greyed out; a save is refused with "This lead is won and is locked. A won lead cannot be changed."
- Its close date cannot be changed: "This lead is won and is locked. Its close date cannot be changed."
- It leaves the Won stage only by a move the pipeline allows from Won: a Stage Rules line from the Won stage, Allowed ticked (best with Based on Approval). Without one: "This lead is won (Won) and is locked. It cannot be moved to Lost."
Moving a lead out of Won or Lost to an open stage clears Won Date and Lost Date.